2024-12-29
ACWA Power Co. received on Dec. 26, a notification that Sirdarya combined cycle gas-turbine (CCGT) achieved its full operation production capacity of 1,500 megawatts.
In a statement to Tadawul, ACWA Power, which holds a 51% stake in CCGT located in Uzbekistan, expects the financial impact of the full operation to be reflected to the company’s 2025 financial results.